PLEASE NOTE: Starting January 14, 2019, we will retire the On the Move blog channel and all traffic advisory blogs will be posted on the SDOT blog channel.
Our Urban Forestry Landscape crews will be performing a fall cut-back and clean-up of the median and planting strips along the Mercer corridor between 5th Ave N and Dexter Ave N this Sunday, December 23rd between the hours of 7 AM and 3:30 PM.
Here’s what you can expect:
- Some of the work will involve a short duration lane closure in both directions along the median near 5th Ave N.
- Once this work is complete the crews will be closing the eastbound outside lane between 5th Ave N and 6th Ave N.