Concrete Results
A busy 2009 construction season including ten downtown/SODO paving projects is wrapping up on-time and in excess of goals set by the Bridging the Gap work plan. The goal for 2009 was 20 lane miles; SDOT paved 28.7 lane miles in 2009. Since 2007 SDOT’s Arterial Asphalt and Concrete (AAC)… Filed Under: General








