Find Posts By Topic

Posts tagged with Aurora Ave N Archives - SDOT Blog

New drawings illustrate potential ideas for Aurora Ave N as we continue building safety upgrades in 2024 | Take our survey by April 5

Blog stats: 1,200 words | 6-minute read At-a-Glance: Aurora Ave N is one of Seattle’s busiest streets connecting many neighborhoods, businesses, and travelers every day. We are sharing several conceptual ideas to help envision potential future improvements along Aurora Ave N. These early sketches would require additional outreach, design, and… [ Keep reading ]

LEVY DOLLARS AT WORK | We built smoother sidewalks & protected mature trees on Aurora Ave N!

Blog stats: 600 words | 4-minute read At-a-glance: This week, we finished repairing sidewalks along the eastern side of Aurora Ave N, from NE 85th to N 105th St. The result: safer, smoother travel for people walking and rolling. Our sidewalk repair program is possible thanks to your tax dollars… [ Keep reading ]

LEVY DOLLARS AT WORK | Take our survey to help develop a better, safer Aurora Avenue N and learn about other projects in the area!

Editor’s Note (9/30/2022): This blog post was updated to note that the survey has been extended through October 7, 2022. Summary: We’re planning improvements to Aurora Ave N as part of the Aurora Ave Project and want to hear from you via our quick survey, open now through October 7,… [ Keep reading ]

Addressing safety on Aurora Ave N is a critical step in our work to achieve our Vision Zero goal of ending traffic deaths and serious injuries on Seattle streets by 2030 

We are committed to achieving our Vision Zero goal of ending traffic deaths and serious injuries on Seattle streets by 2030. Addressing the safety challenges on Aurora Ave N (State Route 99) is a critical step in our work to achieve this goal. Aurora Ave N, as well as… [ Keep reading ]

Travel Advisory: Plan ahead for lane reductions on State Route 99 Aurora Bridge overnight on June 4 and June 18

This post was updated on 6/18/21 to reflect changes in the schedule due to weather. Over two weekends, we’ll install vertical posts in the middle of the State Route 99 Aurora Bridge. All work will happen overnight. The posts help make the center line, which separates the northbound and southbound lanes, more visible. Installing the posts is a near-term safety improvement while we work with the Washington State Department of… [ Keep reading ]

As part of our ongoing work in partnership with the state to make Aurora Ave N (SR-99) safer, we installed two new speed radar signs last week

The work to make Aurora Ave N (a Washington State roadway) safer was made possible through funding secured by State Senator Reuven Carlyle. We have recently installed two solar-powered speed radar signs: one on the southbound side of Aurora Ave N at N 38th St and the other on the northbound side near 6th Ave N. The signs show drivers their speed… [ Keep reading ]